On Monday the three acequias which rely on the main ditch got together to repair sections of the ditch liner washed out when Santa Cruz River was blocked and flooded the Sombrillo area. The patches are temporary but will allow us to start running water this spring. This fall we hope to use capital outlay money to re-pour this section of the ditch.
